Demand Control Device RiCS-Demacon
Measure the power consumption every 30 minutes during demand periods, and if there is a possibility of exceeding the target, issue an alarm or turn ON the output for cutoff control.
- Input pulses from the composite meter for power supply and demand (transaction meter) to calculate power based on the demand pulse rate. Measurement can be adjusted according to the specifications of the transaction meter, such as 50,000p/kW or 2,000p/kW. (A separate pulse detector is required.) - Equipped with a small touch panel LCD display, making it easy to read the display, and the cutoff output can be set to the desired number of stages. - By connecting to our central monitoring and control system RiCS-200, demand measurement data can be displayed in a list or automatically recorded, making it easier to understand demand power consumption through trend graphs. Additionally, fine-tuned operational management is possible through the linkage of cutoff outputs.
- Company:菱機工業
- Price:100,000 yen-500,000 yen